- Inspection and certification are made to ensure that the formwork is properly assembled, compliant with the shop drawings, and meets the safety requirements for concrete pouring.
- Inspection and certification processes each contribute to controlling risks during the construction of formwork and falsework.
Inspections and clearance occur at key stages during formwork construction, including loading. - A separate certification process occurs when the formwork is complete and before pouring concrete. A competent person (certifying engineer) inspects and certifies that the completed formwork meets the design specifications and is structurally sound before it is loaded.
Service provision is subject to project geographical location.